• 24/7 emergency call-outs
  • NAPIT
  • Checkatrade
  • 4 years in business
  • No call-out charge
  • Free, no-obligation quotes
  • Same day response
  • All work tested and certified
  • Fully insured
Emergency lighting testing in Sale: exit sign in a lit commercial room

Emergency Lighting Testing in Sale

Emergency lighting testing in Sale for offices, shops, workshops, HMOs and blocks of flats. We carry out the annual full duration test, record the results, repair failed fittings and give you a certificate for your records.

  • NAPIT registered electricians
  • 4 years in business
  • Free, no-obligation quotes
  • 24/7 emergency call-outs
NAPIT logoCheckatrade logo

Emergency lighting testing in Sale

  1. 01

    Monthly and annual tests

    BS 5266 sets out two routine tests. Each month, every fitting is switched to battery briefly to check it lights. Once a year, each fitting must run for its full rated duration, usually three hours, to prove the battery still holds enough charge.

  2. 02

    Keeping the logbook

    Every test, fault and repair should be written in an emergency lighting logbook. Fire officers, insurers and letting agents may ask to see it, and a complete record shows the system has been looked after. We fill in the logbook at each visit and give you a certificate for the annual test.

  3. 03

    When fittings fail

    Batteries lose capacity over time, so a fitting that passed last year may now last only a few minutes. Failed lamps, damaged diffusers and faulty charging circuits also show up in the test. We tell you which fittings failed and replace them on the same visit where we have the parts, or on a return visit.

How much does emergency lighting testing cost?

Emergency Lighting Testing prices start from £120, subject to a site survey.

The from price covers the annual full duration test of a small premises with a handful of fittings, including the certificate and logbook entries. More fittings, larger or multi-storey buildings, and replacement batteries or fittings add to it. Send us a rough count of your fittings for a fixed quote.

From

£120

Subject to a site survey

Get a free quote

What to expect from emergency lighting testing

Fittings take up to 24 hours to recharge after a full test, so the building has less cover straight afterwards. We plan the annual test for a time when the building is empty or quiet, or test alternate fittings on different visits.

We switch the fittings to battery, check each one lights and stays lit for its rated time, and inspect signs and diffusers. Results go in your logbook, failed fittings are listed for repair, and you receive the annual test certificate.

What's included

  • Full duration test of every fitting
  • Checks of exit signs and diffusers
  • Logbook entries
  • A list of any failed fittings
  • An annual test certificate

How it works

  1. Call or send a message

    Tell us what you need or what has gone wrong. We reply the same day, and there's no call-out charge.

  2. We visit and quote

    We look at the job and give you a free, no-obligation quote before any work starts.

  3. Work done, tested and certified

    We finish the job, test everything we've worked on and hand over the certificate for your records.

Emergency lighting testing questions

Who should carry out monthly emergency lighting tests in Sale?

The monthly test is short and can be done by a trained member of staff or the building manager, using a test key to switch the fittings to battery for a moment. The annual full duration test is best left to a competent electrician, and we can show your staff the monthly checks.

What happens if an emergency light fails its test?

The failure is written in the logbook and the fitting should be repaired as soon as possible, as that part of the escape route has no emergency cover. It usually needs a new battery, lamp or fitting. We quote for the repair and fix it on the same visit where we can.

Can you test emergency lighting in blocks of flats around Sale?

Yes. We test emergency lighting in the shared stairs, landings and entrances of flats around Sale for landlords, managing agents and residents' associations. We arrange access with you, carry out the tests and send the certificate to whoever manages the building.

How long does an emergency lighting test take?

The annual test takes the full rated duration of the fittings, usually three hours, plus time to check each one and record the results. Small premises can often be done within half a day, while larger buildings may be split across visits to keep some cover in place.

Emergency lighting testing across Sale and nearby towns

We test emergency lighting in Sale and the surrounding towns. Choose your area to see more.