Three phase electrical installation in Sale for workshops, commercial units and homes with heavy electrical loads. We install three phase boards, circuits and connections, and liaise with your network operator about the supply.


A standard home has a single phase supply. Three phase uses three live conductors, so it can deliver more power and run large motors more smoothly. It's common in commercial and industrial buildings, and some homes now ask for it for heat pumps or several EV chargers.
If your property only has single phase, the network operator has to upgrade the supply to the meter, which they quote for and carry out. We help with the application, size the installation and fit everything on your side of the meter once the supply is in.
With three phase, the circuits need sharing out across the three phases so none is overloaded. We plan which circuits go on each phase, size the cables and protection to suit, and label the board clearly so future work is easier.
Three Phase Electrical Installation prices start from £1,500, subject to a site survey.
The from price covers installing a three phase distribution board and connecting it to an existing three phase supply. New sub-mains, extra circuits, machinery connections and longer cable runs add to it. Any supply upgrade from the network operator is charged by them separately.
We visit to look at your current supply, the equipment you want to run and where it will go. From that we work out the load, whether the supply needs upgrading and what boards and circuits are needed, then send a fixed quote.
Once any supply upgrade is in place, we install the distribution board, cables and connections, balancing the load across the phases. Everything is tested, including phase rotation for motors, and you get an Electrical Installation Certificate.
Tell us what you need or what has gone wrong. We reply the same day, and there's no call-out charge.
We look at the job and give you a free, no-obligation quote before any work starts.
We finish the job, test everything we've worked on and hand over the certificate for your records.
Yes, if the local network can provide it. More homeowners ask for three phase for large heat pumps, several EV chargers or workshop machinery. The network operator decides whether it's possible and quotes for the upgrade, and we install everything on your side.
The installation on your side usually takes a day or two. The longer part is often waiting for the network operator to upgrade the supply, which depends on their workload and whether digging is needed. We help keep the application moving.
Many do. Lathes, compressors, welders and other large machines often need three phase to run properly. If you're moving into a workshop around Sale or adding new machinery, we check the supply and the equipment's needs before you buy or install anything.
Yes. We connect three phase machines, run new supplies to them with suitable isolation and protection, and check the phase rotation so motors turn the right way. Each connection is tested before the machine is used, and recorded on the certificate.
We install three phase supplies in Sale and the surrounding towns. Choose your area to see more.
Tell us what equipment you need to run, and we'll work out the load and send a free quote.