
Industrial installation in Sale for warehouses, factories, workshops and industrial units. We install containment, armoured cabling, distribution boards and machinery supplies, built to cope with heavy use.


Industrial sites need cabling and fittings that cope with dust, damp, vibration and knocks from forklifts. We use steel containment, armoured cable and fittings with the right ingress protection rating, so the installation keeps working safely in a busy environment.
Industrial work is always priced after a survey. The size of the site, the number of machines and distribution boards, cable runs at height, access equipment and whether work happens outside your operating hours all make a difference. You get a fixed quote before any work starts.
Shutting down a production line costs money, so we plan the work in stages. Where possible, new circuits are installed alongside the old ones and switched over in short, planned shutdowns, which keeps downtime to a minimum. We agree each shutdown with you well in advance.
We start with a site survey, looking at the incoming supply, existing boards, the machinery you run and how the site operates. From that we draw up the scope of work and a schedule that fits around your shifts.
During the installation we keep the work areas safe and agree any shutdowns with you in advance. When it's finished, every circuit is tested, boards are labelled and you get the certificates for your records and your insurer.
Tell us what you need or what has gone wrong. We reply the same day, and there's no call-out charge.
We look at the job and give you a free, no-obligation quote before any work starts.
We finish the job, test everything we've worked on and hand over the certificate for your records.
It depends on the size and scope of the job. Cable lengths, the number of boards and machines, work at height and out-of-hours working all affect the cost. We survey the site in Sale first and give you a fixed quote, so you know the price before work starts.
Yes. We work from 6am to 11pm every day, so planned shutdowns can be early in the morning, in the evening or at weekends. We agree the timings with you in advance and keep each shutdown as short as possible.
Yes. We run new supplies from the distribution board to machinery, with local isolators, suitable protection and cable sized for the load. For three phase machines we check the phase rotation, and every new supply is tested and recorded before the machine goes into use.
You'll get an Electrical Installation Certificate for new work, with test results for every circuit. Your insurer or landlord may ask for these, so keep them on file. We can also carry out periodic inspections later to keep the installation's records current.
We carry out industrial installations in Sale and across the nearby towns. Choose your area for more.
Tell us about the site and the equipment you run, and we'll arrange a survey and a fixed quote.